This is how the building looks like now. Since the beginning of the construction in August last year, the building is taking its shape and is now at its final stages to becoming a fully built, office cum showroom building.

Angle view on Lot 9929
Angle shot of the building. The building will be painted with Buttermilk color. Not sure if it’s nice, but will see the end result within this week.

Front of the building
Front section of the building.

Staircase leading up to the Ground floor
This is the staircase leading up to the ground floor. There’s a sub-level half way below the main road level.

Ground floor space
This is how it looks on the ground floor. Pretty spacious. Anyone interested to rent?

Tempered glass on the floor
Danger: Tempered Glass on the floor. 6ft x 8ft x 0.5 inch.

Glasses Installed
4 glasses were installed so far. All D.I.Y. works, with help from a few suction tools, a forklift, an alligator car jack, and a few manpower.

Estimated completion date: June 2008. All system go on July.