Lot 9929 Construction: January 2008 Update
25
January
Checkpoint 1 - 2 | Checkpoint 3 | Checkpoint 4 | Road Works | Finishing Touches
This is how the building looks like now after 2 months of hard work under the rainy sky. The weather had been really unforgiving for the last couple of months as it pours and delayed the construction works.

View of the building from the side, facing the Tudan road. 2 months ago, the building looked like this.

Front view of the building. The front door is facing the Lutong-Kuala Baram highway.

These are the daredevil roof installers with no strings attached. They had the roof completed within 3 days. Will have the photo update tomorrow.

Walls up in the 1st floor. Tempered-glass will be installed into the gap between the walls.

A small Iban village at the side of the building. They have friendly villagers and they’re a source of manpower, but could be a possible threat of theft. A NEW Bosch breaker was stolen just last week when it was left unattended at the FRONT door.
This is a quick update of last week’s progress. More pictures tomorrow.